Location: Puerto Madero - Buenos Aires - Argentina
Raindance Science performed a risk analysis in terms of structural fire protection and smoke management. The structural response to fire was analysed, identifying risk zones and mitigation measures.
Furthermore the fire strategy was assessed pointing out possible improvements in order to guarantee the structural integrity of the building and to safeguard the life of the occupants.
Raindance Science performed a risk analysis in terms of structural fire protection and smoke management. The structural response to fire was analysed, identifying risk zones and mitigation measures.
Furthermore the fire strategy was assessed pointing out possible improvements in order to guarantee the structural integrity of the building and to safeguard the life of the occupants.
Location: Buenos Aires - Argentina
The Banco Macro Tower in Buenos Aires, Argentina is a 30-storey building with a total surface area of 53,000 square metres. Raindance Science performed a smoke management study for the atrium, and for the auditorium and parking lot, located in the 2nd and 3rd lower ground of the building.
The study combined methods based on empirical correlations, zone models and simulations of computational fluid dynamics.
The Banco Macro Tower in Buenos Aires, Argentina is a 30-storey building with a total surface area of 53,000 square metres. Raindance Science performed a smoke management study for the atrium, and for the auditorium and parking lot, located in the 2nd and 3rd lower ground of the building.
The study combined methods based on empirical correlations, zone models and simulations of computational fluid dynamics.
Location: Mall in Angola.
Made for the Korean company Hanil.Mech.Elec.Consultants
The project was based on smoke management study for the atrium of the mall where there was not enough extraction capacity.
Made for the Korean company Hanil.Mech.Elec.Consultants
The project was based on smoke management study for the atrium of the mall where there was not enough extraction capacity.
Review of fire safety in the Paulista tower, currently being developed by Cyrela Paulista of Brazil. Life, fire safety and structural safety of the building has been reviewed. The fire safety of underground parking was analyzed in detail, and a "Fire Design" was produced at high density considering parked vehicles. The analysis was intended to provide overall direction and recommendations for building designers.
Location: San Isidro, Lima - Peru.
Our strategic allies, Engineering Services, developed the fire protection strategy and design criteria for this building, achieving a high level of protection compatible with european and american industry standards.
Our strategic allies, Engineering Services, developed the fire protection strategy and design criteria for this building, achieving a high level of protection compatible with european and american industry standards.
Client : Centro Empresarial Cronos
Exit Systems
Fire suppression system
Design criteria consultation
Safety Consultation
Smoke management
Third review
Exit Systems

Fire suppression system

Design criteria consultation

Safety Consultation

Smoke management

Third review

Location: Bangkok – Thailand
Our strategic allies, Engineering Services, developed the fire protection strategy and design criteria for this building, achieving a high level of protection compatible with european and american industry standards.
Our strategic allies, Engineering Services, developed the fire protection strategy and design criteria for this building, achieving a high level of protection compatible with european and american industry standards.
Our strategic allies, Engineering Services, developed the fire protection strategy and design criteria for this building, achieving a high level of protection compatible with european and american industry standards.